Volunteers at the first work session in September connected sections between the north stream crossing and the first gathering area. A second stream crossing was also installed during this session.
A total of 11 adults and four students participated in more than three hours of work with a wonderful lunch afterward, prepared and served by a Bowman family.
No comments:
Post a Comment